Latest news

Construction of traffic interchange on the 57th km of highway M-5 «Ural»

On March 5, 2011 "Autobahn" started works on site.

Scheduled completion date – November 2011.

and "Corporation Engtransstroy", LLC on construction of traffic interchange on the 57th km of highway M-5 «Ural».

Designation of traffic interchange:

Construction of traffic interchange provides for:

  • relieving  the existing part of the federal highway М-5 «Ural», which runs through the settlements, from transport not related to their servicing;
  • enhancement of traffic safety;
  • improvement of ecological situation;
  • ensuring high speed for transit traffic streams;
  • high level of cargo-and-passenger traffic.

 

Basic technical parameters:

  • highway category – Iа;
  • design speed – 120 km/h;
  • width of carriageway – 2×7,5 m;
  • roadbed width – 36,0 m;
  • number of traffic lanes – 4;
  • width of separating strip – 13,5 m;
  • width of roadside – 3,75 m

maximum longitudinal gradient – 40‰.