Performance of works for object Reconstruction of a bridge crossing on the 25th km of the Small Moscow Ring Road.
- Details
- Parent Category: Новости
- Published on -0001-11-30
The works are currently performed for creation of the construction camp together with preparatory works including rearrangement of the networks of telephone conduits.
Works are complete for filling of the road bed on the access road to the sewage treatment works (left bank) and also works have been started for replacement of inappropriate soils on the main roadway (Sta.+92 – Sta.7+78).