Latest news

Construction of traffic interchange on the 57th km of highway M-5 «Ural»

On February 18, 2011 the contract was signed between Russian-German Joint Venture Autobahn Ltd and "Corporation Engtransstroy", LLC on construction of traffic interchange on the 57th km of highway M-5 "Ural".

Designation of traffic interchange:

Construction of traffic interchange provides for:

  • relieving  the existing part of the federal highway М-5 "Ural", which runs through the settlements, from transport not related to their servicing;
  • enhancement of traffic safety;
  • improvement of ecological situation;
  • ensuring high speed for transit traffic streams;
  • high level of cargo-and-passenger traffic.

 

Basic technical parameters:

  • highway category – Iа;
  • design speed – 120 km/h;
  • width of carriageway – 2×7,5 m;
  • roadbed width – 36,0 m;
  • number of traffic lanes – 4;
  • width of separating strip – 13,5 m;
  • width of roadside – 3,75 m
  • maximum longitudinal gradient – 40‰.

P1010069On March 5, 2011 the main works commenced on site (construction of roadbed on exit No. 11).

Scheduled completion date – November 2011.

 

 

 

 

 

 

 

 

 

 

 

Photographic materials on works progress are given in section "Our projects".